最新的IBM Maximo Manage v8.0 Implementation - C1000-132免費考試真題
問題1
Which statement is true regarding Master Preventative Maintenance (PM) records?
正確答案: D
說明:(僅 VCESoft 成員可見)
問題2
During the course of a Work Order an Asset is upgraded. This change requires the Specification of the Asset to be updated automatically when the Work Order is Completed. How can this be achieved?
正確答案: B
問題3
What are three available associations in the Hazards application?
正確答案: A,E,F
說明:(僅 VCESoft 成員可見)
問題4
What are two depreciation methods available in the Assets application? (Choose two.)
正確答案: C,E
問題5
In which status can a Job Plan be modified to add a new task?
正確答案: A
問題6
The loT Connector provides Maximo Manage, Maximo Health and Maximo Predict the ability to connect to which two data sources?
正確答案: C,E
說明:(僅 VCESoft 成員可見)
問題7
In the Assets application a used engine needs to be replaced with a rebuilt engine, how might the rebuilt engine inherit the depreciation schedule from the used engine?
正確答案: A
說明:(僅 VCESoft 成員可見)
問題8
In which three applications can a failure class be applied? (Choose three.)
正確答案: B,D,E
問題9
Which two events can be triggered from a Condition Monitoring Point? (Choose two.)
正確答案: A,B