問題1
The best way to determine feasibility of the capacity plan for a work center is to use:
正確答案: C
問題2
Which of the following methods is used to control variation to improve product quality?
正確答案: A
問題3
When a company moves from sampling inspection to internal process control, which of the following actions should be taken prior to evaluating supplier performance?
正確答案: C
問題4
A plant that implements a total preventive maintenance program would be likely to:
正確答案: D
問題5
Which of the following outcomes is typical of employee engagement?
正確答案: B
問題6
A supplier of roller bearings makes lots of 10,000 and sorts them automatically according to size. In a typical lot of 10,000, the sizes break into the following categories:

The product requires rollers on target or, at most, 0.0001 oversize. Experience indicates that 100% must be reinspected before use because the machine inspection lets a few defective units slip through. The supplier should be encouraged to take which of the following actions?

The product requires rollers on target or, at most, 0.0001 oversize. Experience indicates that 100% must be reinspected before use because the machine inspection lets a few defective units slip through. The supplier should be encouraged to take which of the following actions?
正確答案: D
問題7
An immediate benefit of implementing lean manufacturing is improvement in:
正確答案: D