最新的CIDQ Interior Design Professional - IDPX免費考試真題
問題1
An office client tells the designer they would like their staff break room to be visible from the reception area to convey a relaxed environment. This request reflects the client's
正確答案: A
說明:(僅 VCESoft 成員可見)
問題2
What is the MINIMUM illumination level at the walking surface for a means of egress?
正確答案: C
說明:(僅 VCESoft 成員可見)
問題3
What is the PRIMARY benefit for incorporating a design firm?
正確答案: C
說明:(僅 VCESoft 成員可見)
問題4
During a high school renovation project, the school board and several teachers each call the designer several times a week to request changes. What is the BEST way for the interior designer to keep the project on schedule?
正確答案: D
說明:(僅 VCESoft 成員可見)
問題5
What provision should a designer include in the contract to minimize liability in claims that arise from delays caused by other project members?
正確答案: D
說明:(僅 VCESoft 成員可見)
問題6
What is one way to reduce indoor air pollutants?
正確答案: D
說明:(僅 VCESoft 成員可見)
問題7
During demolition, the contractor discovers dry rot in some existing walls that are to remain. After reaching an agreement with the client and contractor on a solution, what should be issued before construction continues?
正確答案: B
說明:(僅 VCESoft 成員可見)
問題8
In an existing non-sprinklered multi-tenant building, a client will be converting a suite from a bank into a restaurant serving more than 49 persons. What fire rating is REQUIRED between the new tenant and the existing adjacent insurance office?
正確答案: A
說明:(僅 VCESoft 成員可見)
問題9
When the owner/contractor agreement is executed, which documents specifically form the contract documents?
正確答案: B
說明:(僅 VCESoft 成員可見)
問題10
What is the MAXIMUM occupant load of a business occupancy with one exit?
正確答案: C
說明:(僅 VCESoft 成員可見)
問題11
When calculating the boundary area using BOMA, the following items are considered rentable exclusions:
egress stairs, occupant storage, and
egress stairs, occupant storage, and
正確答案: C
說明:(僅 VCESoft 成員可見)
問題12
The interior designer presents budget options based on quality ranges and the client approves a budget on the low end. Throughout the design process, the client has added higher quality items and the project is now over budget. What could have been done to prevent this problem?
正確答案: A
說明:(僅 VCESoft 成員可見)
問題13
On a small project with an unclear scope involving multiple stakeholders, which fee method would be BEST utilized by the designer?
正確答案: A
說明:(僅 VCESoft 成員可見)
問題14
Which party is responsible for requesting inspections during construction of a project?
正確答案: A
說明:(僅 VCESoft 成員可見)

