最新的ISEB ISTQB-BCS Certified Tester Foundation Level - ISEB-SWT2免費考試真題

問題1
Debugging and Testing are key activities in the software development lifecycle.
Which of the following are 'Debugging' activities?
a) Identifying, a failure
b) Locating the cause of failure
c) Fixing the defect
d) Checking the fix has resolved the failure

正確答案: A
問題2
Consider the typical objectives of testing. Which of the following metrics can be used to measure the effectiveness of the testing process in achieving one of those objectives? 1 credit

正確答案: B
說明:(僅 VCESoft 成員可見)
問題3
Which of the following BEST describes the relationship between test planning and test execution? [K2]

正確答案: B
問題4
Pick the best definition of quality:

正確答案: D
問題5
Boundary value testing:

正確答案: A
問題6
Which pair of definitions is correct?

正確答案: D
說明:(僅 VCESoft 成員可見)
問題7
A data driven approach to test automation design is best described as:

正確答案: D
問題8
A tool that supports traceability, recording of incidents or scheduling of tests is called..?

正確答案: C
問題9
Which TWO of the review types below are the BEST fitted (most adequate) options to choose for reviewing safety critical components in a software project? Select 2 options.

正確答案: B,E
問題10
Which of the following could be a reason for a failure?
1) Testing fault
2 ) Software fault
3 ) Design fault
4 ) Environment Fault
5 ) Documentation Fault

正確答案: C