最新的Nutanix Certified Professional - Business Continuity (NCP-BC) 7.5 - NCP-BC-7.5免費考試真題

問題1
What is the bandwidth limit of a single Nutanix Cloud Gateway for IPSec traffic?

正確答案: A
說明:(僅 VCESoft 成員可見)
問題2
An administrator is troubleshooting a hung replication. When checking the replication status, the complete percent and bytes completed do not increase. The administrator checks the Stargate logs on the destination cluster and confirms the writes are failing with " nfs status 28 " . Checking the container info on the destination cluster, free space on the container is 0. The administrator confirms that there is sufficient space available in the storage pool. What could be the reason for free space on the container to be 0?

正確答案: C
說明:(僅 VCESoft 成員可見)
問題3
An administrator builds a single recovery plan that includes workloads protected with Asynchronous (async) and Nearsync replication schedules together with workloads protected by Synchronous replication (syncrep) schedules. Which statement is true regarding this configuration?

正確答案: C
說明:(僅 VCESoft 成員可見)
問題4
An administrator is testing the failover scenarios from a source availability zone (AZ1) to a destination availability zone (AZ2). The administrator successfully performs an unplanned failover from AZ1 to AZ2.
The administrator then immediately tries to use the unplanned failover option to fail the VM back to AZ1, but does not see the VM listed under Recovery Plan. What could be the cause?

正確答案: C
說明:(僅 VCESoft 成員可見)
問題5
An administrator executes an Unplanned Failover. The VMs recover at the Recovery Site and are powered on.
However, the application owners report that the VMs are completely isolated and cannot communicate with any other services on the network. The administrator checks the Recovery Plan and notices the Network Mapping section was left blank.
What is the expected configuration for VMs recovered without a valid Network Mapping?

正確答案: A
說明:(僅 VCESoft 成員可見)
問題6
An administrator performed an unplanned failover from AZ1 (primary) to AZ2 (recovery). Later, AZ1 is restored and the administrator wants to fail back the entities to AZ1. Which two statements are correct?
(Choose two.)

正確答案: A,B
說明:(僅 VCESoft 成員可見)
問題7
An organization is finalizing its Disaster Recovery (DR) plan. The primary objective is to balance cost- efficiency with a target RTO of under 15 minutes. Data currently resides in Object Storage, but the team is debating between a Zero Compute approach and a Pilot Light approach. Why would a Pilot Light infrastructure be selected over a Zero Compute model despite the higher " Moderate " cost?

正確答案: C
說明:(僅 VCESoft 成員可見)