Relativity RCA 考試概覽:
| 認證廠商: | Relativity |
| 考試名稱: | Relativity 認證管理員考試 |
| 考試代碼: | RCA |
| 支援語言: | English |
| 考試時間: | 75 minutes |
| 證照有效期限: | 12 個月 |
| 考試形式: | 多選題 |
| 實際考試題數: | 約 80 題(包含預試題) |
| 考試費用: | $300 美元 |
| 相關認證: | Relativity 審查管理專家 Relativity 分析專家 Relativity 基礎設施專家 Relativity 處理專家 Relativity 項目管理專家 Relativity 數據管理專家 |
| 及格分數: | 標準化分數 700/1000 |
| 推薦課程: | 管理基礎 I 管理基礎 II |
| 考試報名: | Relativity 認證門戶 Relativity 社群認證註冊 |
| 範例考題: | Relativity RCA 範例考題 |
| 考試方式: | 在線或考試中心(RelativityOne 認證通常採用在線監考方式) |
| 必備條件: | 建議具有 6 個月以上 Relativity 管理經驗;無正式先決條件考試要求 |
| 官方大綱網址: | https://www.relativity.com/resources/certification/admin/relativity-certified-administrator/ |
Relativity RCA 考試大綱主題:
| 章節 | 目標 |
|---|---|
| 案例管理 | - 案例設置和管理 - 用戶和群組管理 |
| 分析與審查管理 | - 審查工作流程 - 結構化分析 |
| 工作區管理 | - 工作區配置 - 權限和安全 |
| 生成與輸出 | - 生成設置 - 導出和報告 |
| 數據管理與導入 | - 數據加載 - 文件上傳和導入工作流程 |
最新的 Relativity Admin RCA 免費考試真題:
1. Why would Review Center charts show "Unknown User 1" for some coded documents?
A) A reviewer was originally part of the workspace and coded documents, but has since been removed from the workspace.
B) The project has not yet been prepared, so Review Center is not yet tracking reviewer coding decisions.
C) A reviewer no longer has permissions to code documents in the project.
D) There was an error encountered for that particular user and the queue must be re-prepared.
2. What operation does the document re-production feature support?
A) Replace a document that was produced as native only with produced images.
B) Replace produced images with a placeholder.
C) Replace produced images with a native.
D) Replace a document that was produced as a placeholder with another placeholder.
3. You grant the permissions below so that a reviewer on your team can begin creating and running aiR for Review projects. What problem will this reviewer encounter when attempting to analyze documents using aiR for Review?
Object Security:
* aiR for Review Project: View, Edit, Add
* aiR for Review Prompt Criteria: View, Edit, Add
Tab Visibility:
* aiR for Review Projects
A) Without the tab visibility permission granted for the aiR for Review dashboard, the reviewer will not be able to start the analysis.
B) They will only be able to view aiR for Review projects at the instance-level instead of the workspace level.
C) Without individual Object Security permissions granted for each analysis type's object, they will not be able to view any results.
D) They will only be able to view aiR for Review results highlighted in the Viewer.
4. The lead attorney is working in the Hot Documents list view. They add a filter to the Hot Documents view and can no longer see all of the email attachments in the document list. Why might this be?
A) The Family Group relational view is no longer selected.
B) The selected filter only applies to attachments that are marked Hot.
C) The Document Extension field is not indexed.
D) The Group Identifier field is not populated.
5. What is the default production sort order?
A) Control number
B) Family group
C) Artifact ID
D) Custodian
問題與答案:
| 問題 #1 答案: A | 問題 #2 答案: B | 問題 #3 答案: C | 問題 #4 答案: A | 問題 #5 答案: C |

下載最新試用版
973位客戶反饋
我們對我們的產品非常有信心,所以我們不提供会给客户带去麻煩的產品。








61.228.133.* -
我將可以擁有一份很好的工作了,感謝 VCESoft 網站的幫助,讓我成功通過了 RCA 考試,并拿到了認證書。