最新的Oracle FLEXCUBE Universal Banking 12 Technical Implementation Essentials - 1z0-413免費考試真題

問題1
Which option is used when the deployment methodology of Oracle FLEXCUBE is integrated with an external system in an asynchronous manner? (Choose the best answer.)

正確答案: A
問題2
In Oracle FLEXCUBE you can specify the destination of the report that you want to generate. Identify three destinations that you can specify. (Choose three.)

正確答案: B,C,E
問題3
CORRECT TEXT
An Oracle FLEXCUBE User who has completed his transactions has logged off for the day Subsequently, the Authorizer notices some errors in one of the transactions. What can the Authorizer do? (Choose the best answer.)
A Delete the transaction
B. Keep the transaction on hold till the next day.
C. Assign the transaction to another User.
D. Unlock the transaction and correct the invalid entry
正確答案:
B
問題4
What details should be captured in the parameterization sheet during implementation? (Choose the best answer.)

正確答案: C
問題5
Oracle FLEXCUBE has a single record table for the Switch Interface Gateway initialization parameters. Maintenance on this table is performed during implementation of the Switch Interface Gateway system. What is the name of this table? (Choose the best answer.)

正確答案: A
問題6
Which statement is true about migrating data from a legacy system to FLEXCUBE? (Choose the best answer.)

正確答案: D
問題7
Which option should be used in the WebLogic startup script for the ELCM-related Toplink XML parser? (Choose the best answer.)

正確答案: A
問題8
The system derives the details of each XML request by referring to GWTM_FCJ_FUNCTIONS. Based on which set of parameters is any subsequent processing of the request performed'? (Choose the best answer.)

正確答案: A
問題9
Which three statements are true about integrating the Electronic Messaging System (EMS) with Swift Alliance Gateway, Mail Server, and Mobile SMS Notification'? (Choose three.)

正確答案: A,D,E