最新的Oracle Database 12c Essentials - 1z0-497免費考試真題

問題1
Consider 10 scenarios that result in database downtime. Which five of them are considered as planned downtime?

正確答案: D,E,F,G,I
問題2
Consider an application in which memory required for each session is 400 KB and memory required for each server process is 4 MB. The pool size is 100 and the number of shared servers used is 100. If there are 5000 client connections, what is the amount of memory used by a dedicated server?

正確答案: C
問題3
You are installing OracleDatabase 12c on a machine. When you run the installer; Oracle Universal installer (OUI) shows a message that says one of the product-specific prerequisite checks has failed:
Checking available swap space requirements...
Expected result: 1512MB
Actual Result: 1018MB
Check complete. The overall result of this check is: failed <<
Problem: The system does not have the required swap space.
What happens to the installation in this situation?

正確答案: A
說明:(僅 VCESoft 成員可見)
問題4
After a ___________ statement is issued, a transaction ends. (select three)

正確答案: A,B,E
說明:(僅 VCESoft 成員可見)
問題5
Which two statements about Automatic Data Optimization (ADO) are true?

正確答案: B,C
問題6
Which two statements represent where Oracle Net must reside?

正確答案: B,C