問題1
Which Cisco Unified Computing System (UCS) server model is a rack-mount server used in a Vblock System?

正確答案: B
問題2
A SAN administrator must use the zone commit command to activate a zone set on a Cisco MDS 9148.
Which feature is enabled on the switch?

正確答案: D
問題3
In addition to the Logical Configuration Survey (LCS), which document is required prior to manufacturing a Vblock System 720?

正確答案: A
問題4
What are two expected results of the VMware vMotion test plan conducted by VCE at the completion of a Vblock System build? (Choose two.)

正確答案: A,D
問題5
During a Vblock System logical build, which three configuration changes require Unified Computing System Manager (UCSM) access? (Choose three.)

正確答案: A,C,E
問題6
What is the data store location for Management Virtual Machines, in the mini Advanced Management Pod (mini-AMP)?