最新的Microsoft Administering Visual Studio Team Foundation Server - 70-496免費考試真題

問題1
Your network environment includes a Microsoft Visual Studio Team Foundation Server 2012 (TFS) server.
Version control is configured with one project collection and two team projects. Some users use 2010 and 2012 clients, such as Visual Studio and Team Explorer Everywhere.
You need to ensure that users will be prompted by, and can satisfy, the comments check-in policy when using both 2010 and 2012 clients.
Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.)

正確答案: B,C
問題2
DRAG DROP
Your team uses Microsoft Visual Studio Team Foundation Server (TFS) to manage automated builds.
You need to make modifications to one of your build definitions. You want your team to be able to queue new builds, but you want those builds to run only after you complete your changes.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
正確答案:
問題3
Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server. Developers use Visual Studio 2012.
You want to modify the build definition deployment process.
You need to meet the following requirements:
- The process will stop new builds from being started while making the
modifications.
- Builds should queue up while modifications are being made.
- Once modifications are complete, all queued builds should be processed.
What should you do?

正確答案: C
問題4
HOTSPOT
You are a software developer for Contoso, Ltd. Microsoft Visual Studio Team Foundation Server (TFS) manages your code and project artifacts. The root of the project is S/Contoso/Main.
You work primarily in the $/Contoso/Main/Website folder and below it. You do not want a copy of the folder $/Contoso/Main/Website/Images due to its size.
You need to maximize your workspace for efficiency by minimizing the number of files you pull from the server.
In the table below, select which folder should be mapped as cloaked and which as active. Make only one selection in each column.
正確答案:
問題5
Your client's network environment includes a Microsoft Visual Studio Team Foundation
Server (TFS) 2012 server.
Some users, who do not have client access licenses perform, user acceptance testing.
You need to allow user acceptance testers to only record and view bugs they have raised.
What should you do?

正確答案: B
問題6
Your client's network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server installed at its main office.
The network administrator at a remote office reports high WAN utilization. Users at the remote office report slow response times when downloading source code.
You need to minimize WAN utilization and improve the response times for downloading source code.
What should you do?

正確答案: B
問題7
DRAG DROP
Your team uses Microsoft Visual Studio Team Foundation Server (TFS) to manage automated builds.
You want to change the drop location of a build definition during a single execution of the build. All subsequent builds for that definition should use the drop location currently defined.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
正確答案:
問題8
Your network environment includes a Microsoft Visual Studio Team Foundation Server 2012 (TFS) server.
You build a multi-tiered application that contains the following tiers:
----
User Interface Application Services Integration Services Database
You need to modify the item template to meet the following requirements:
--
When a bug is created, the testing team is able to identify the application tier. You are able to produce a report of bugs by tier.
Which three actions should you perform? (Each correct answer presents part of the solution. Choose three.)

正確答案: A,C,D
問題9
You have upgraded an installation of Microsoft Visual Studio Team Foundation Server (TFS) 2013.
You need to modify an existing project on which you want to enable portfolio management.
What should you do?

正確答案: A
說明:(僅 VCESoft 成員可見)
問題10
Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server. Your TFS environment currently consists of a single team project collection (TPC) named DevTPC, one build controller named BC-1, and one build agent named BA-1.
You need to create a separate TFS test environment by cloning your existing environment. You need to achieve this goal by utilizing as few new TFS services as possible.
Which of the following diagrams shows the correct architecture for solving this problem?

正確答案: C