最新的SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP4 - C-TSCM42-64免費考試真題
問題1
Which of the following structural elements does a process order have? (Choose three.)
正確答案: A,D,E
問題2
In production order processing, for which of the following objects can you enter a confirmation?
(Choose three.)
(Choose three.)
正確答案: A,C,D
問題3
Which data forms the basis for calculating the capacity requirement for an operation?
(Choose three.)
(Choose three.)
正確答案: B,D,E
問題4
What does SAP ERP mean?
正確答案: D
問題5
Where are the standard operation times for an operation defined?
正確答案: D
問題6
A user has entered planning strategy group 10 (make-to-stock production) in the material master (SAP ECC) of a product. For the coming months, requirements with requirement type LSF (derived from the main strategy 10) have been planned. The user would like to change the requirement type from LSF to VSF planning with final assembly (in accordance with planning strategy 40) for requirements in the production plan that have already been saved.
Which of the following statements are applicable in this case? (Choose two.)
Which of the following statements are applicable in this case? (Choose two.)
正確答案: A,D
問題7
When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling.
Which planning procedure would you use to process the problem in order to create a solution that is feasible from a requirements planning perspective?
Which planning procedure would you use to process the problem in order to create a solution that is feasible from a requirements planning perspective?
正確答案: D
問題8
Which of the following statements about ATP (Available To Promise) checks for material components are correct? (Choose two.)
正確答案: C,E