最新的SAP Certified Application Associate - Planning and GATP in SAP SCM APO 7.0 EHP1 - C-TSCM44-65免費考試真題

問題1
The customer wants to implement safety stocks dependent on forecast accuracy and replenishment lead time accuracy. Quantity-based complete deliveries are needed.
What do you have to do to achieve this?
Note: There are 2 correct answers to this question.

正確答案: B,E
問題2
Which of the following steps are necessary to generate an RFC connection that can be used for the APO Core Interface?
Note: There are 3 correct answers to this question.

正確答案: A,D,E
問題3
Your customer creates an infinite multilevel MRP run for a finished product and its components using the process heuristic SAP_MRP_001.
Product heuristics are not maintained in the product masters and no strategy profile is selected in the planning run.
How are the strategy settings derived in this situation?

正確答案: A
問題4
What is a feature of the SNP optimizer?

正確答案: D
問題5
The customer wants to use CTM to check for free stock in all locations first, and then for possible production.
How can you implement this scenario?

正確答案: C
問題6
Which of the following configuration sequences describes the setup for "days' supply / receipt days" key figures within the product view correctly?
Note: The desired result is displayed in the screenshot.

正確答案: B
問題7
There are 6 predefined SNP planning areas.
What is the common feature of all 6 planning areas?

正確答案: A
問題8
Which of the steps described below do you need to perform when creating InfoObjects to set up a DP or SNP scenario?

正確答案: B