最新的IBM Certified System Programmer - IBM IMS - C2090-549免費考試真題

問題1
An external stored procedure, assigned to application environment AE1, should run in parallel to a maximum of 10 concurrent procedures. Which action will achieve this?

正確答案: B
問題2
Someone has issued a -STOP DATABASE(DB1) SPACE(TS1) command without previously checking if the page set is currently in use by any URs. The page set is ultimately placed in STOPP restrictive state. Using the DISPLAY THREAD(*) TYPE(SYSTEM) command, what can you do to reverse the -STOP DATABASE command and make the page set available without stopping?

正確答案: B
問題3
In an XRF environment, what process is performed by the Alternate IMS?

正確答案: C
問題4
A systems programmer gets notified of an application response time issue with a dynamically bound distributed application. Which two could help diagnose the problem? (Choose two.)

正確答案: A,D
問題5
A systems programmer has just installed critical maintenance on a DB2 system that affects early code and they need this code to be activated immediately to fix a problem they are experiencing.
Which action should be performed by the systems programmer to activate the new early code with the least impact to the z/OS system?

正確答案: D
問題6
What happens when the message queue data sets become full?

正確答案: D
問題7
DSNZPARM parameter URLGWTH (UR LOG WRITE CHECK) is set to a very high value. Based on the warning messages caused by this setting, it is determined that a local thread that normally runs in a very short period of time has been completing changes for an excessively long period of time without a commit. The thread needs to be removed from the system with minimal log access.
Which action should be taken to resolve the issue?

正確答案: A
問題8
Dynamic Resource Definition can be used to replace which type of sysgen?

正確答案: D
問題9
How is the WADS used for logging?

正確答案: B
問題10
Which two actions must be performed for a data sharing traditional image copy disaster recovery? (Choose two.)

正確答案: B,C