最新的GAQM Certified Lean Six Sigma Yellow Belt - CLSSYB免費考試真題

問題1
Which of the following would likely be a CTQ (Critical-to-Quality) for the purchase of a service?

正確答案: A
問題2
The ROI for a project is a measurement metric that stands for Return on Investment and is one of the methods used to measure the success of a Lean Six Sigma project.

正確答案: B
問題3
To reduce the people or operator introduced defects into a process it is best if a Belt can design and implement a means of ________________ into the process.

正確答案: B
問題4
The RPN or Risk Priority Number is used to rank the various Failure Modes as to their impact on the output of the subject process.

正確答案: B
問題5
A Belt has determined that the insurance claim form needn't be reviewed by accounting thereby improving the number of claims a processer can handle. According to Cost of Poor Quality (COPQ) definitions RTY improvement would be considered _______________.

正確答案: A
問題6
When we assess the Voice of the Customer we are attempting to determine the gaps in our processes between "what is" and __________________.

正確答案: D
問題7
A Monitoring Plan put into place at the conclusion of a project will provide for adequate systems with key metric readouts indicating out-of-spec conditions.

正確答案: B
問題8
A Lean Principle that states the process of eliminating waste is a continual process requiring one to always be on the lookout for ways to reduce the seven elements of waste is known as ____________ .

正確答案: D