1. What content would be in an incident report if that incident report was based on the IEEE 829 Standard for SoftwareTest Documentation?
(i)Identification of configuration items of the software or system.
(ii)Software or system lifecycle process in which the incident was observed.
(iii)Description of the anomaly to enable reproduction of the incident.
(iv)Number of occurrences of the incident.
(v)Classification of the cause of the incident for metrics and for reporting purposes.
Number of correct answers: 1
A) ii, iii
B) i, ii, iii, v
C) i, iii, iv
D) i, ii, iii
2. The following test cases for a Library Management System are available to test changes made to the functions and data structures associated with borrowers
1. Add a new borrower to the system
2. Update a borrower's data
3. Remove a borrower from the system
4. Loan a book to a borrower
5. Return a book from a borrower
6. Reserve a book for a borrower
7. Send "reservation ready" message to a borrower
Which of the following test sequences represents a possible use case? (a test sequence always start with test
#1)
A) 1-4-2-7-5-6-3
B) 1-6-2-5-7-4-3
C) 1-2-6-7-4-5-3
D) 1-6-4-7-5-3-2
3. Which of the following is a Black Box test design technique?
A) Equivalence Partitioning
B) Decision Coverage
C) Error Guessing
D) Statement Coverage
4. Test script TransVal 3.1 tests transaction validation via screen TRN 003B. According to the specification (PID ver 1.3 10b iv) the validation screen should not accept future dated transactions. Test script TransVal 3.1 passes. Test script eod 1.4 tests end of day processing and is run after the execution of TransVal 3.1 using data entered during that test Which of the following is the BEST detail on an incident report? [K3]
A) Title. Transaction input screen validation..Reproducible. Yes. Description. Script eod 1..4 fails . Screen shot of the failure attached. Validation of transaction entryon screen TRN-003B should not allow future dated transactions - see PID ver 1.3 para 10b iv.
B) Title. End of Day failure.. Reproducible. Yes. Description. Script eod 1.4 fails when the first transaction of the day is a future dated transaction. Screen shot of the failure attached.
C) Title. Screen TRN-003B validation of transaction date. Reproducible. Yes. Description. Script eod 1.4 fails when the first transaction of the day is a future dated transaction. Screen shot of the failure attached. Validation of transaction entry on screen TRN-003B should not allow future dated transactions
- see PID ver 1.3 para 10b iv.
D) Title. Screen TRN-003B validation of transaction date.. Reproducible. No. Description. When a future dated transaction is processed by the end of day process, a failure can occur. This does not always happen. Screen shot of the failure attached.
5. Typically, exit criteria may consist of:
A) Adequacy of the test approaches taken.
B) Estimates of defect density or reliability measures.
C) Defining the amount, level of detail structure, and templates for the test documentation.
D) Discussions on disaster recovery.
問題與答案:
| 問題 #1 答案: D | 問題 #2 答案: B | 問題 #3 答案: A | 問題 #4 答案: C | 問題 #5 答案: B |