SAP C_S43_2601 考試概覽:
| 認證廠商: | SAP |
|---|---|
| 考試名稱: | SAP 認證實施顧問 - SAP S/4HANA 雲端私有版,資產管理 |
| 考試代碼: | C_S43_2601 |
| 考試形式: | 多選題, 單選題, 情景題 |
| 支援語言: | English |
| 證照有效期限: | 5 年 |
| 相關認證: | SAP 認證應用助理 - SAP S/4HANA 雲端 |
| 考試時間: | 180 分鐘 |
| 推薦課程: | SAP 培訓和採用 SAP S/4HANA 資產管理學習旅程 |
| 考試報名: | SAP 認證中樞 SAP Learning |
| 範例考題: | SAP C_S43_2601 範例考題 |
| 考試方式: | 線上監考考試或測試中心(SAP 認證中樞) |
| 必備條件: | 無強制性先決條件。建議具備 SAP S/4HANA 和資產管理流程的基本知識。 |
| 官方大綱網址: | https://training.sap.com/certification/ |
SAP C_S43_2601 考試大綱主題:
| 章節 | 目標 |
|---|---|
| SAP S/4HANA 雲端私有版中的資產管理 | - 技術物件
|
最新的 SAP Certified Application Associate C_S43_2601 免費考試真題:
問題 #1
Create a Task List
The project team evaluates during the implementation project Task Lists in SAP S/4HANA Asset Management. The following features need to be checked:
* Create a Task List header
* Create Task List operations
* Create a Task List with 3 Task List operations. Maintenance Strategy Z## comprises Maintenance Packages with different hierarchy levels.
Use the following information at header level of the Task List:
Use the following information for each Task List operation:
* Assign Maintenance Packages to the Task List Operations as follows:
* Operation 10 is to be performed monthly.
* Operation 20 is to be performed every 4 months.
* Operation 30 is to be performed every 12 months.
問題 #2
Schedule a Maintenance Plan
The project team evaluates during the implementation project the scheduling of Maintenance Plans in SAP S
/4HANA Asset Management. The following features need to be checked:
Schedule a Maintenance Plan
Display a generated Maintenance Order
Schedule the previously created Maintenance Plan. The following prerequisites have to be met:
The next upcoming call is the 4 MON Maintenance Package
Calculate the Completion Date of the last Maintenance Package as follows: Today's date minus 4 weeks (e.g.
today's date: 15th of December > > > Completion Date: 17th of November) The Call Date is always 10 days before the Plan Date.
Note:
Check your Maintenance Plan and adapt it, if necessary, before you schedule it.
Check the following information in the generated Maintenance Order:
number of order operations: 2
Maintenance Plan: number of the previously created Maintenance Plan
Last Included Task List: A / TL-## / 1
問題與答案:
| 問題 #1 答案: 僅成員可見 | 問題 #2 答案: 僅成員可見 |

下載最新試用版
1114位客戶反饋
我們對我們的產品非常有信心,所以我們不提供会给客户带去麻煩的產品。








123.193.73.* -
最近報考的C_S43_2601認證考試,我順利的通過了,因為有你們的考古題,它覆蓋了我考試中的所有問題。