SAP C_TS452 考試概覽:
| 認證廠商: | SAP |
|---|---|
| 考試名稱: | SAP Certified - SAP S/4HANA Cloud Private Edition, Sourcing and Procurement |
| 考試代碼: | C_TS452 |
| 考試時間: | 180 分鐘 |
| 考試費用: | 500美元(各地區可能有所差異) |
| 支援語言: | English, German |
| 實際考試題數: | 典型題數為80題 |
| 相關認證: | SAP S/4HANA Sourcing and Procurement SAP S/4HANA Cloud Private Edition certifications |
| 證照有效期限: | 通常為1至2年;須依SAP認證政策更新為準 |
| 考試形式: | 單選題, 複選題 |
| 及格分數: | 約60%(SAP計分分數可能有所調整) |
| 推薦課程: | SAP學習路徑:SAP S/4HANA Cloud Private Edition採購與尋源 SAP S/4HANA採購訓練課程 |
| 考試報名: | SAP訓練與認證商店 SAP認證中心 |
| 範例考題: | SAP C_TS452 範例考題 |
| 考試方式: | 線上監考或實體考試中心(Pearson VUE) |
| 必備條件: | 建議具備SAP S/4HANA與採購流程基礎知識;無強制規定需先通過特定考試 |
| 官方大綱網址: | https://learning.sap.com/certifications/sap-certified-associate-sap-s-4hana-cloud-private-edition-sourcing-and-procurement |
SAP C_TS452 考試大綱主題:
| 章節 | 目標 |
|---|---|
| 主題 1: 尋源與供應商管理 | - 供應商評估 - 詢價(RFQ)與報價處理 |
| 主題 2: 發票驗證與財務整合 | - 與財務(FI)整合 - 物流發票驗證(LIV) |
| 主題 3: 報表與分析 | - 標準採購報表 - 採購相關SAP Fiori應用程式 |
| 主題 4: 主資料 | - 商業夥伴概念 - 物料主檔 - 採購資訊記錄與來源清單 |
| 主題 5: 採購流程 | - 釋放程序與核准機制 - 特殊採購流程 - 請購與採購訂單處理 |
| 主題 6: 庫存與倉儲整合 | - 進貨與出貨 - 庫存概覽與庫存管理基礎 |
| 主題 7: SAP S/4HANA Cloud Private Edition採購與尋源概覽 | - 採購流程概覽 - 組織結構與企業結構 |
最新的 SAP Certification Exams C_TS452 免費考試真題:
A specialty-chemicals manufacturer is validating scheduling-agreement sourcing in SAP S/4HANA Cloud Private Edition for a business unit that is retiring a spreadsheet used to track supplier delivery commitments. Buyers can create and release scheduling agreements, and demand from approved requisitions is flowing into the standard procurement process. For most raw-material families, the system creates purchase orders and applies the expected agreement reference correctly. However, for one catalyst family, purchase orders are created with the correct supplier but without the expected scheduling-agreement linkage, so downstream schedule management cannot proceed as designed.
The same sourcing setup works for another raw-material family in the same purchasing organization. The sourcing lead wants the issue corrected before the spreadsheet tracker is retired. Buyers must not maintain delivery commitments manually, and the fix must remain standard because the same sourcing model will be reused in another unit next quarter.
What should the consultant check first?
- A. Rebuild requisition approval because approved demand should always carry the agreement linkage into purchase-order creation.
- B. Ask buyers to enter the agreement reference manually on each purchase order until the rollout is complete.
- C. Broaden buyer authorization so the missing agreement linkage can be bypassed during order creation.
- D. Verify whether the affected catalyst family is correctly included in the scheduling-agreement source binding and follow-on determination settings used during PO creation.
答案:D 🗳️
說明:(僅 VCESoft 成員可見)
<strong>CHALLENGE 1 — Source Eligibility Control for Shared Regulated Materials</strong> A reviewer notes that regulated-material demand can still be fulfilled under two viable approaches: one follows the intended approved-source pattern, and the other allows local substitution from a supplier that is commercially acceptable but not prepared under the same eligibility assumptions. The business asks which path should guide template promotion. Which answer is best?
- A. Use the intended approved-source pattern unless it prevents regulated-material demand from being fulfilled in a workable operational sequence
- B. Keep both sourcing approaches available so each site can choose based on material urgency
- C. Use the local substitution route because any supplier that keeps production moving is acceptable during SIT
- D. Use the local substitution route for high-volume solvents and the approved-source path for all other regulated materials
答案:A 🗳️
說明:(僅 VCESoft 成員可見)
A packaging-materials producer is validating centrally governed contract sourcing in SAP S/4HANA Cloud Private Edition for a division that is retiring a spreadsheet used to track supplier commitments. Buyers can create and release quantity contracts, and approved purchase requisitions are available for conversion. For most material families, purchase-order creation correctly applies the released contract and updates the expected consumption values. However, for one specialty-film family, the purchase order is created with the correct supplier but does not consume the expected contract quantity during validation.
The same contract design works for another material family in the same purchasing organization. The sourcing manager wants the issue corrected before the spreadsheet tracker is retired. Buyers must not update contract usage manually, and the fix must remain standard and transportable for the next rollout phase.
What should the consultant check first?
- A. Broaden buyer authorization so the missing contract-consumption step can be bypassed during order creation.
- B. Verify whether the affected specialty-film family is correctly included in the contract-consumption and source-binding settings used during PO creation.
- C. Ask buyers to record the missing contract consumption outside the system until rollout is complete.
- D. Rebuild requisition approval because approved demand should always reduce contract quantities automatically.
答案:B 🗳️
說明:(僅 VCESoft 成員可見)
A veterinary-pharmaceutical distributor is validating physical-inventory completion in SAP S/4HANA Cloud Private Edition while migrating a regional warehouse from a local stock-control process into the shared inventory template. Inventory documents can be created, count entry works, and variance review completes for most storage sections. However, for one temperature-sensitive medication group in the migrated warehouse, the document remains in a review-complete state and the system blocks the final difference posting.
The same medication group completes correctly in an already stabilized warehouse, and other groups in the migrated warehouse post without issue. The migration lead wants the defect corrected before mock cutover. Manual stock correction is not allowed, and the warehouse process must remain standard because the same migration template will be reused for additional sites.
What is the most appropriate first action?
- A. Broaden warehouse authorization so users can force the final difference posting for the blocked documents.
- B. Check whether the migrated warehouse has item-group-specific status or control settings preventing the transition from reviewed variance to final difference posting.
- C. Ask warehouse users to process the temperature-sensitive medications through the stabilized warehouse until migration is complete.
- D. Recreate the inventory documents because blocked final postings usually begin with count-entry inconsistency.
答案:B 🗳️
說明:(僅 VCESoft 成員可見)
A distribution company is testing consumption-based planning in SAP S/4HANA Cloud Private Edition as part of a phased modernization from spreadsheet-driven replenishment. Forecast-relevant materials were loaded and planners completed initial parameter setup. For most materials, planning proposals are generated as expected. However, a group of high-usage spare parts shows no replenishment proposal even though recent consumption exists and the materials are active in the plant. The planners suspect the planning run itself is broken, but the issue appears only for the affected material subset.
The program manager wants the team to protect the modernization timeline while avoiding custom forecasting logic. The correction must remain within standard planning behavior and be reusable for additional materials entering the new model next quarter.
Which action is most appropriate?
- A. Tell planners to create manual purchase requisitions for the spare parts until the new planning model is fully stabilized.
- B. Check whether the affected materials have the required planning-relevant parameters and master-data settings needed for consumption-based proposal generation.
- C. Post additional test consumption against the materials because planning proposals usually appear only after a second transaction cycle.
- D. Increase the planning run frequency so the system recalculates the missing proposals more aggressively.
答案:B 🗳️
說明:(僅 VCESoft 成員可見)

下載最新試用版
921位客戶反饋
我們對我們的產品非常有信心,所以我們不提供会给客户带去麻煩的產品。








61.183.129.* -
使用VCESoft的考古題,讓我非常輕松的通過了C_TS452考試。謝謝你們超級棒的考試教材和良好的服務!