What documents must a contractor submit as part of a project to consultants for review?
正確答案: D
說明:(僅 VCESoft 成員可見)
問題2
Which of the following tests would most likely be used to determine if engineered fill was placed to meet contract specifications?
正確答案: D
說明:(僅 VCESoft 成員可見)
問題3
What type of concrete structural element is shown in the image below?


正確答案: D
問題4
What information is provided by a 5-point Proctor density test on a soil sample?
正確答案: A
說明:(僅 VCESoft 成員可見)
問題5
A civil engineering technologist needs to recommend a foundation design for a commercial building. The borehole logs identify unsuitable bearing soils beneath the proposed floor elevation to a depth of 4 m and shallow bedrock at 5 m. Which of the following types of design should the technologist recommend?
正確答案: B
說明:(僅 VCESoft 成員可見)
問題6
A project manager is aware of a faulty fall protection railing. The safety issue is reported but not remedied or documented. In the event of an incident, what is the maximum penalty for the first offence under the Occupational Health and Safety Act?
正確答案: A
說明:(僅 VCESoft 成員可見)
問題7
A civil engineering technologist asked an engineer in training (EIT) to write a deficiency report. After a few revisions, the report is still disorganized and has errors. What would be an appropriate action to take for the technologist?
正確答案: B