1. A CM's responsibility for safety on the jobsite includes
A) drafting the contractor's safety plan.
B) certifying subcontractor compliance.
C) a professional obligation shared with others.
D) no obligation for safety as it is the contractor's responsibility.
2. A CM is milling and paving a 2-mile-long bridge with a surface that is in total failure. The owner gave the contractor October 24 as the fixed completion date. Meanwhile, the owner has promised the public that work hours would be 7am-7pm, 5 days per week and that the bridge would be completed by September 1.
The bridge deck is poured on a steel grid deck, but this type of operation has never been performed in the state and complications from weather have slowed progress. The contractor has requested to work nonstop 24/7 to meet the deadline told to the public.
The CM should
A) tell the contractor they have until September 1 and can only work 7am-7pm.
B) discuss with the owner and tell the contractor to do only 1/2 of the bridge.
C) meet with the owner and contractor to vet all issues/options and make a decision.
D) meet with the contractor to go over realistic time frames and make a decision.
3. An agency CM is overseeing the construction of a large, complex multi-story, high security building in a remote area. The building had a specialized spire installed at the top, which serves as an encrypted signal transmitter. Construction is complete and the contractor has de-mobilized, but then it is discovered that the signal transmitter is not transmitting the signal. The owner's QC plan required testing for the functionality of the transmitter, but the contractor has not shown test results reflecting adequate performance. Who is responsible for the cost of remobilization?
A) Owner
B) Contractor
C) Agency CM
D) Designer of record
4. Industry best practice is to conduct a pre-bid conference. The intent of the pre-bid conference is to
A) survey existing conditions and reveal unforeseen conditions.
B) limit the number of bidders on the project.
C) resolve any questions about contract requirements and scope of work.
D) mitigate change orders and delays.
5. Lifecycle analysis of a project will provide the greatest impact during which of the following phases?
A) Pre-Design
B) Procurement
C) Construction
D) Design
問題與答案:
| 問題 #1 答案: C | 問題 #2 答案: C | 問題 #3 答案: B | 問題 #4 答案: C | 問題 #5 答案: A |

下載最新試用版
1355位客戶反饋
我們對我們的產品非常有信心,所以我們不提供会给客户带去麻煩的產品。








36.231.232.* -
上週,在CMAA 的 Construction-Manager 考試中我使用了你們提供的考試題庫,之后我通過了考試。你們的考題和答案是非常有幫助的。太幸運了,大多數考試中的問題都來自你們的題庫。