最新的HP Administering HP CloudSystem Matrix Solutions - HP0-D15免費考試真題
問題1
Which enhanced support feature for physical networks with multiple VLANs is introduced in CloudSystem Matrix 7.0?
正確答案: D
說明:(僅 VCESoft 成員可見)
問題2
An HP CloudSystem solution has been installed on the company data center to accommodate three (Dev, OA, Prod) departments computing requirements. Each department insists that they are the only owners who control and access their services, but the resource are shared using an IT as a service model with weekly pricing for services. Each group has their own Designer account and designed users are placed in the IO_users group. Some templates are shared all three departments.
The Dev department has decided to contribute six additional DL380 servers to the environment to be used as hypervisor hosts with the requirement that only they can have access to those servers.
The Prod department has encountered situations where their services are placed on low performance disk drives and has asked that the situations be fixed to use high performance drives.
The QA department utilization of the cloud is sporadic. When they use it, the QA department guidelines heavy loads during the entire week-long testing cycle.
Refer to the scenario.
Management has asked for a strategy moving forward that can address the disk performance issues that the Prod department is having. Which strategy can be implemented to give Prod the opportunity to ensure performance for their services, while encouraging other departments to evaluate their own requirements before ordering services?
The Dev department has decided to contribute six additional DL380 servers to the environment to be used as hypervisor hosts with the requirement that only they can have access to those servers.
The Prod department has encountered situations where their services are placed on low performance disk drives and has asked that the situations be fixed to use high performance drives.
The QA department utilization of the cloud is sporadic. When they use it, the QA department guidelines heavy loads during the entire week-long testing cycle.
Refer to the scenario.
Management has asked for a strategy moving forward that can address the disk performance issues that the Prod department is having. Which strategy can be implemented to give Prod the opportunity to ensure performance for their services, while encouraging other departments to evaluate their own requirements before ordering services?
正確答案: D
問題3
Your current HP CloudSystem environment consists of one c7000 enclosure with two virtual connect Flex-10 modules. Two new enclosures contain both the Virtual Connect Flex-10 and virtual Connect Fabre Channel modules. You want the Virtual Connect Ethernet domain configuration to be identical across all these enclosures.
What is the connect method to quickly replicate one enclosure configuration to the other two enclosures?
What is the connect method to quickly replicate one enclosure configuration to the other two enclosures?
正確答案: D
問題4
Which HP infrastructure Orchestration portal is used to approve a service request within the HP Cloud System Matrix?
正確答案: C
說明:(僅 VCESoft 成員可見)
問題5
A customer has a c7000 enclosures with 16 ProLiant BL460c G7 server blades. Two of the server blades are VMware ESXi 6 hosts and remaining six are Microsoft Windows Server 2008 R2 servers. The Windows servers need to be virtualized to allow all 16 servers to become 5 hosts. Which licensing is required to perform Physical to Virtual (P2V) migrations?
正確答案: A
問題6
Which tests describes when a customer is provided with an organized CloudSystem Matrix Implementation and changed for the extra capacity only, on a pay-per-use basis?
正確答案: A