最新的HP Aruba Certified Design Expert Written - HPE6-A49免費考試真題

問題1
Refer to the exhibit.

A customer has a wired infrastructure shown in the exhibit. The customer is in the process of expanding their wireless services. They will now add a new wireless solution, with mobility controllers (MCs) connected as shown. The new wireless solution will support a total of 450 APs and about 26,000 wireless devices. It must provide seamless roaming across the entire campus.
After the new deployment, both wired and wireless devices experience IP connectivity issues.
Which change to the existing infrastructure should the architect recommend to support all of the customer requirements?

正確答案: D
問題2
In which of these scenarios do the customer requirements point towards tunneled node, or dynamic segmentation, on AOS-Switches?

正確答案: A
問題3
Case study
A retailer needs a wireless and wired network upgrade, as well as an authentication and access control solution for a network that includes a main office with a three-floor building and six branch sites. The branch users all use resources at the main corporate office. Branch office employees will use wireless connections. At the main office, employees use wired and wireless connections.
The customer wants the strongest authentication for employee wireless connections. It is also important that the MC role-based firewall can implement consistent access controls on employee connections no matter where the employees connect and no matter how they connect (wirelessly or, at the main site, wired).
The customer also needs to provide complimentary wireless access for guests. Guest should be redirected to a portal, through which they can register and login.
The customer would like two SSIDs, CompanyXEmployee and CompanyXGuest. The company wants to divide employees in two groups, managers and staff. In the corporate network, managers should only have access to Server Group Managers and staff should only have access to Server Group Staff. Each server group includes necessary services such as domain and DHCP, as well as servers that the employees access to do their jobs. All employees should also have access to the Internet. Guests should only have HTTP and HTTPS access, and only to the Internet.
The customer has:
*a maximum of 1000 employee devices
*a maximum of 100 guest devices at the same time
*500 devices on wired ports at the main site, which will be supported by 12 new AOS-Switches (mostly employee laptops, as well as a few non-802.1X capable printers, which should just communicate with print servers) The devices used by employees include 450 company-issued laptops, which the company wants to screen for security issues and violations of security policies. All authentications are assumed to be concurrent.
To fulfill the requirements for the wireless network upgrade, the architect plans to propose:
*5 RAPs at each of 6 branch sites
*60 APs at the main site
The architect will also propose an MM and ClearPass.
The architect still needs to plan the Mobility Controllers (MCs). The customer requires high availability for wireless services and redundancy for the MCs. If a single MC fails, the network must continue to function without impact. If an MC fails, the customer must also receive a replacement component for the failed component by the next business day so that their IT staff can install it and get the network back to normal operation as soon as possible.
Software upgrades must also be seamless, without the introduction of any downtime for wireless services, and the customer needs to be able to obtain the latest software over the lifetime of the solution for the next several years.
Which plan for the VLANs assigned to users at the main site follows the best practices? (Note that the infrastructure could have additional VLANs in various locations; this plan refers only to user VLANs.)

正確答案: D
問題4
Refer to the exhibit.


The network architect has created the BOM shown in the exhibit for a complete new wired and wireless solution for a customer. This solution will support 6000 wireless clients and 900 wired clients.
The customer wants to discover and manage every component of the network in AirWave, including MMs, MCs, APs, and switches.
How many AirWave licenses does the architect need to add?

正確答案: D
問題5
What is one reason that an architect might choose to use pico-cell coverage rather than overhead in a stadium?

正確答案: C
問題6

A stadium wants to deploy location-based services, including blue-dot wayfinding over a 200,000 square foot (18,580 sq. m) area. The customer also wants to enable targeted notifications when guests walk past particular areas. The customer has selected a 1 year subscription.
The exhibit shows the BOM that the architect created in Iris.
Which correction should the architect make?

正確答案: C
問題7
A writing closet needs to support 20 APs and 110 wired endpoints. It has four strands of OM3 fiber to the network core 150 feet (45 m) away. The customer wants the links to the network core to support at least
10GbE. The customer also requires no loss in connectivity for the switches in the closet, even with the loss of one link.
The architect plans to recommend three 2930M 40G 8SR PoE+ switches, two 4-port SFP+ modules, and two SFP+ SR transceivers.
What should the architect change about the plan?

正確答案: D