PECB ISO-45001-Lead-Auditor 考試概覽:
| 認證廠商: | PECB |
|---|---|
| 考試名稱: | PECB Certified ISO 45001 Lead Auditor Exam |
| 考試代碼: | ISO-45001-Lead-Auditor |
| 考試時間: | 180 分鐘 |
| 及格分數: | 70% |
| 實際考試題數: | 80 multiple-choice questions |
| 支援語言: | Chinese (availability may vary), French, German, English, Spanish |
| 考試形式: | Closed-book exam, Multiple-choice questions |
| 證照有效期限: | 3 years (renewable with Continuing Professional Development credits) |
| 相關認證: | PECB Certified ISO 45001 Foundation PECB Certified ISO 45001 Lead Implementer PECB Certified Lead Auditor |
| 考試費用: | 因地區/培訓提供商而異(通常包含在培訓套餐中;獨立考試費用各異) |
| 推薦課程: | PECB ISO 45001 Lead Auditor 培訓課程 ISO 45001 培訓計畫(授權合作夥伴) |
| 考試報名: | PECB 考試報名 PECB 官方認證頁面 |
| 範例考題: | PECB ISO-45001-Lead-Auditor 範例考題 |
| 考試方式: | 根據提供商提供線上或現場監考考試 |
| 必備條件: | 建議(但非強制)具備 ISO 45001 標準與審核原則的知識;具有 OHSMS 或審核的相關經驗高度推薦。 |
| 官方大綱網址: | https://pecb.com |
PECB ISO-45001-Lead-Auditor 考試大綱:
| 主題 | 簡介 |
|---|---|
| 主題 1 |
|
| 主題 2 |
|
| 主題 3 |
|
| 主題 4 |
|
參考:https://pecb.com/en/education-and-certification-for-individuals/iso-45001/iso-45001-lead-auditor
最新的 ISO 45001 ISO-45001-Lead-Auditor 免費考試真題:
Select two of the following options which are not the responsibility of an audit team leader.
- A. To develop the audit team ' s checklists.
- B. To communicate with the auditee ' s management.
- C. To represent the audit team.
- D. To report the audit results to the client.
- E. To offer certification to the management.
- F. To introduce the audit team to the client.
答案:E,F 🗳️
Showitoff is an organisation spcialising in the design and production of wall decorating material for the domestic market. During an ISO 45001 certification audit of the site, the auditor comes across an open, walled area just outside the maintenance department. It contains various scraps of wood and metal as well as several rusty components. Several heavy concrete beams are learning against a thin brick wall in which cracks are visible. When asked about it, the OHS Manager states that he presume that the material come from maintenance work, so it is the Maintenance Manager's responsibility.
The auditor interviews the Maintenance Manager in his department. He asks about the area outside and is told that it contains some excess materials that the Manager likes to keep in case they come in handy at some stage. The auditor points out that the wall appears to be unstable collapse at any moment. The Maintenance Manager is not aware of such a situation.
Which three statement represent good audit practice?
- A. The audit should raise a nonconformity against ISO 45001.
- B. The audit should ask the Maintenance Manager to conduct a safety survey.
- C. The auditor should advice the organisation to get rid of the walled area.
- D. The audit should refer the organization to the health and safety authorities.
- E. The audit should demand that the Maintenance Manager deals with the wall.
- F. The auditor should consider surveying more areas of the site for other potentially unsafe situations.
- G. The auditor should check whether the organization has identified the safety hazards associated with the walled area.
- H. The audit should check the lines of communication between the OHS Manager and maintenance Manager.
答案:F,G,H 🗳️
說明:(僅 VCESoft 成員可見)
You are conducting a Stage 2 audit of a fast-food provider that operates three local restaurants.
Earlier in the day, you visited restaurant no. 2, where you noted there were no first aid kits or fire extinguishers present on site.
You are now interviewing the Chief Executive Officer, and you ask him if he is aware of the absence of OHS equipment at restaurant 2. He confirms that he is and says that this is because all the restaurant equipment was removed from the room, and next week, the new restaurant equipment will start being installed.
He shows you a management of change record that confirms this and identifies several potential risks arising from the equipment refresh. A single action is recorded that states, "Close restaurant 2 to the public until replacement equipment is installed and staff are trained on its use." How should you react? Select one.
- A. Interview the chefs and front-of-house staff at restaurant 2 to see how they feel about the restaurant having to be closed.
- B. Raise an opportunity for improvement, as the new equipment should have been ordered in sufficient time so as not to have had to close restaurant no. 2.
- C. Raise a nonconformity against clause 9.1.2 as the restaurant is not meeting its legal requirements.
- D. Simply record your findings, then move on to your next checkpoint item.
答案:D 🗳️
說明:(僅 VCESoft 成員可見)
You are an audit team leader who has been asked by the certification body to attend a regional conference given by OH and S representatives. You find the presentations informative, particularly the one that has just finished, which focused on what organisations were doing to adapt work to workers.
When the opportunity for questions arises, you ask the presenter to give you examples of what his own organisation had done to adapt work to workers. He provides the following responses.
Which three are actual examples of adapting work to workers?
- A. Providing work instructions by video to an organisation where workers speak different languages and no subtitles are provided.
- B. Providing those who spend the majority of their working days on their computers with frequent breaks.
- C. Ensuring only competent workers are employed in key roles.
- D. Giving workers the opportunity to stand for election to the organisation ' s health and safety committee.
- E. Amending a control station to facilitate handicapped workers.
- F. Amending the start and finish times of processes to accommodate cultural practices.
- G. Keeping welfare facilities clean and available for use at all times.
- H. Planning actions to identify OH and S risks and opportunities.
答案:B,E,F 🗳️
說明:(僅 VCESoft 成員可見)
Think about a Stage 1 initial certification audit. Which one of the following statements is true?
- A. The purpose of the audit is to verify that the OH and S management system is effectively implemented.
- B. Involvement and participation by the auditee is not required for a Stage 1 audit.
- C. ISO 19011:2018 provides requirements for conducting a Stage 1 audit.
- D. Gaps in the OH and S management system may be reported as "Areas of Concern".
答案:D 🗳️
說明:(僅 VCESoft 成員可見)
正在檢視第 1 頁(共 25 頁)。
正在檢視第 1-5 題(共 121 題)。

下載最新試用版
862位客戶反饋
我們對我們的產品非常有信心,所以我們不提供会给客户带去麻煩的產品。








114.38.15.* -
VCESoft 考古題讓我通過了 ISO-45001-Lead-Auditor 考試,大多數實際考試中的問題都來自這里的考古題。請注意,你們必須小心地通過每一個問題,因為在測試中沒有返回按鈕。