最新的NICET Inspection and Testing of Fire Alarm Systems Level I - ITFAS-Level-1免費考試真題

問題1
Which two of the following are needed to perform a periodic test of a projected beam type smoke detector? (Choose two.)

正確答案: B,D
說明:(僅 VCESoft 成員可見)
問題2
Within a fire alarm control unit, what is the maximum delay in seconds for alarm system responses after the initiation device has been activated?

正確答案: D
說明:(僅 VCESoft 成員可見)
問題3
How should the documentation cabinet be labeled?

正確答案: B
說明:(僅 VCESoft 成員可見)
問題4
After 15 years from initial installation, all fixed-temperature, nonrestorable heat detectors shall be replaced or have how many detectors per 100 laboratories tested?

正確答案: B
說明:(僅 VCESoft 成員可見)
問題5
After the secondary power supply has operated the fire alarm system under quiescent load,the secondary power shall be capable of operating all alarm notification appliances for which length of time?

正確答案: D
說明:(僅 VCESoft 成員可見)
問題6
What is the inspection frequency of supervising station alarm system transmitters?

正確答案: D
說明:(僅 VCESoft 成員可見)
問題7
Which NFPA standard determines the testing of a carbon monoxide device or system?

正確答案: D
說明:(僅 VCESoft 成員可見)
問題8
When is a shunt trip operated to power down an elevator?

正確答案: A
說明:(僅 VCESoft 成員可見)
問題9
When shall the elevator alternate level recall function be initiated?

正確答案: C
說明:(僅 VCESoft 成員可見)