最新的USGBC LEED AP Building Design + Construction (LEED AP BD+C) - LEED-AP-BD-C免費考試真題

問題1
According to the Integrative Process Credit, the discovery phase of energy-related systems should identify

正確答案: C
說明:(僅 VCESoft 成員可見)
問題2
A LEED Building Design and Construction: Schools project pursuing Location and Transportation Credit, Green Vehicles elects to follow Option 2. Green Buses or School-Owned Vehicles. What action must the project take to meet the Option 2 requirements?

正確答案: A
說明:(僅 VCESoft 成員可見)
問題3
A project attempting to meet the preferred parking requirements for Location and Transportation Credit, Green Vehicles may provide what incentive to meet the requirements and highlight the project sustainable vehicle strategy?

正確答案: C
說明:(僅 VCESoft 成員可見)
問題4
What type of lighting can be used for 25% or less of the total connected lighting load for all regularly occupied spaces as a strategy to improve lighting quality?

正確答案: D
說明:(僅 VCESoft 成員可見)
問題5
A project team is planning a new office building in a cold climate. The team aims to achieve significant reductions in peak thermal loads. Which strategy should it apply to minimise peak thermal loads associated with infiltration?

正確答案: C
說明:(僅 VCESoft 成員可見)
問題6
A design team is pursuing Indoor Environmental Quality Credit, Indoor Air Quality Assessment. The building is 1,000 ft2 (93 m2) and has a 10 ft. (3 m) ceiling height. In order to earn the credit, what is the required volume of supply air for the entire building flush-out?

正確答案: C
說明:(僅 VCESoft 成員可見)
問題7
A project team is attempting Location and Transportation Credit: High Priority Site and selects Option 1: Historic District. To demonstrate that the project is located in an infill site, the project team must confirm that:

正確答案: D
說明:(僅 VCESoft 成員可見)
問題8
Which of the following must be included in the Sustainable Sites Credit, Site Assessment?

正確答案: D
說明:(僅 VCESoft 成員可見)
問題9
Major renovation projects must meet which of the following minimum percentage savings when taking credit for renewable energy systems?

正確答案: D
說明:(僅 VCESoft 成員可見)
問題10
A project's installed water fixtures do not exceed WaterSense maximum levels. Which compliance path should the LEED AP select under Water Efficiency Prerequisite, Indoor Water Use Reduction, and what type of documentation is required to demonstrate compliance with this path?

正確答案: D
說明:(僅 VCESoft 成員可見)
問題11
The LEED AP is leading the first design charrette for a new LEED project with the project's owners. What document should be used to record the project goals to be used throughout the design of the project?

正確答案: A
說明:(僅 VCESoft 成員可見)
問題12
In the Indoor Environmental Quality Credit, Low-Emitting Materials, what types of products need to be evaluated for both Volatile Organic Compound (VOC) content of the material and VOC emissions of the material?

正確答案: D
說明:(僅 VCESoft 成員可見)
問題13
Which of the following pairs of strategies can help reduce the landscape water demand beyond the prerequisite level in Water Efficiency Credit, Outdoor Water Use Reduction?

正確答案: B
說明:(僅 VCESoft 成員可見)