問題1
Up lo how many maximum points can a project earn under the Regional Priority credit?
正確答案: B
說明:(僅 VCESoft 成員可見)
問題2
Which of the following is a tradable commodity representing proof that a unit of electricity was generated from a renewable source?
正確答案: B
說明:(僅 VCESoft 成員可見)
問題3
Which formula is used for calculation of the percentage of restoration area?
正確答案: D
說明:(僅 VCESoft 成員可見)
問題4
Which describes the difference between graywater and blackwater?
正確答案: A
說明:(僅 VCESoft 成員可見)
問題5
Which class of refrigerants contributes the most to ozone depletion potential (ODP)?
正確答案: B
說明:(僅 VCESoft 成員可見)
問題6
When redesigning wall assemblies to meet energy code requirements while improving noise control, which strategy effectively supports both objectives?
正確答案: C
說明:(僅 VCESoft 成員可見)
問題7
A civil engineer would like to incorporate strategies for rainwater management in order to prevent the flooding occurring at the project site. Which design technique should be used to help prevent stormwater damage to the building and surrounding site?
正確答案: D
說明:(僅 VCESoft 成員可見)
問題8
What occurs when light from a parking area spreads and surplus lighting spills beyond the project boundary?
正確答案: B
說明:(僅 VCESoft 成員可見)
問題9
Which project approach helps identify synergies between building systems and reduce costly design changes later in the project?
正確答案: D
說明:(僅 VCESoft 成員可見)
問題10
ASHRAE 189.1 is an alternative compliance path to what building code?
正確答案: B