最新的International Code Council Commercial Mechanical Inspector - M2免費考試真題

問題1
Unless listed for a greater or smaller dimension, mechanical draft venting systems shall terminate a minimum of _____ feet below an openable window.

正確答案: B
說明:(僅 VCESoft 成員可見)
問題2
Which of the following is not a required mechanical inspection?

正確答案: A
說明:(僅 VCESoft 成員可見)
問題3
Supports for hazardous exhaust duct shall be constructed of:

正確答案: A
說明:(僅 VCESoft 成員可見)
問題4
When a permit is issued, the code requires that one set of approved plans and specifications be returned to the applicant.
This set of plans and specifications shall be:

正確答案: C
說明:(僅 VCESoft 成員可見)
問題5
A low-pressure steam heating boiler is a boiler furnishing a maximum steam pressure of _____ psi.

正確答案: B
說明:(僅 VCESoft 成員可見)
問題6
Given: An industrial water heater boiler has a manufacturer's listing of 18 inches wall clearance. It is installed with a protective wall assembly of 24-gauge sheet metal spaced out 1 inch from the wall.
The reduced installation clearance from the wall for this appliance is _____ inches.

正確答案: B
說明:(僅 VCESoft 成員可見)