CompTIA SK0-003 考試概覽:
| 認證廠商: | CompTIA |
|---|---|
| 考試名稱: | CompTIA Server+ 認證考試(2009 年版) |
| 考試代碼: | SK0-003 |
| 相關認證: | CompTIA A+ CompTIA Network+ |
| 考試費用: | 232 美元 |
| 考試時間: | 90 分鐘 |
| 實際考試題數: | 100 |
| 考試形式: | 線性題型, 選擇題 |
| 支援語言: | English |
| 證照有效期限: | 已停考;通過後終身有效 |
| 及格分數: | 750 分(評分範圍 100–900 分) |
| 推薦課程: | CompTIA 官方學習指南 CompTIA 學習資源 |
| 考試報名: | Pearson VUE Prometric |
| 範例考題: | CompTIA SK0-003 範例考題 |
| 考試方式: | 於 Pearson VUE 或 Prometric 考場進行電腦化測驗;自 2015 年 7 月 31 日起停考 |
| 必備條件: | 無強制報考資格;建議具備 CompTIA A+ 認證以及 18–24 個月的伺服器相關實務經驗 |
| 官方大綱網址: | https://www.comptia.jp/pdf/Server+%20SK0-003%20Exam%20Objectives.pdf |
CompTIA SK0-003 考試大綱主題:
| 章節 | 權重 | 目標 |
|---|---|---|
| 故障排除 | 10% | - 軟體與網路故障排除
|
| 伺服器硬體 | 21% | - 擴充裝置與週邊設備
|
| 儲存裝置 | 21% | - 儲存管理
|
| 網路功能 | 16% | - 網路通訊協定與連線能力
|
| 伺服器作業系統 | 19% | - 安裝與設定
|
| 災難復原與資訊安全 | 13% | - 備份與回復
|
最新的 Server+ SK0-003 免費考試真題:
A technician backs up the data on a server with a full backup on Sunday night. On Monday through Friday night, a different type of backup is run on the server. A file needs to be restored Saturday morning. If the technician needs all tapes for the week (Sunday-Friday) to restore the file, which of the following describes the type of backup performed Monday-Friday night?
- A. Full
- B. Daily
- C. Differential
- D. Incremental
When a technician left the server room Monday evening everything was operational. When the technician returned Tuesday morning, the front bezel was off of the mail server, and it had been powered off. Which of the following should be checked FIRST?
- A. Whether the power cord is attached
- B. TCP/IP settings
- C. Server room access log
- D. RAID configuration
Which of the following is MOST likely to occur if the temperature in the server room is cooled too quickly after a power outage?
- A. Server response times are slow due to temperature change
- B. Server forms condensation
- C. Server's services will not start
- D. Server will not POST
Which of the following is the BEST way to make sure the network printer is automatically installed when the user logs on?
- A. Create and implement a logon script.
- B. Make sure the user has permission to print to the printer.
- C. Log onto the user's computer as a local administrator and install the printer.
- D. After the user has logged on, install the printer.
A restaurant is considering placing a server to run their restaurant software in the kitchen of the restaurant. Which of the following environmental considerations is of MOST concern?
- A. Dust
- B. Power
- C. Humidity
- D. Temperature

下載最新試用版
919位客戶反饋
我們對我們的產品非常有信心,所以我們不提供会给客户带去麻煩的產品。








42.72.229.* -
我成功的通過了我的所有認證考試,非常感謝你們!