最新的IBM Sterling B2B Integrator V5.2, Solution Implementation - C2060-218免費考試真題

問題1
Assuming a system with configuration for tracking purchase orders as "PON", an operator needs to search for an inbound ASC X12 purchase order from a specific trading partner. Which correlation nameshould be selected along with the Sender ID from the Document Advanced Search?

正確答案: D
問題2
When switching between editing a Business Process (BP) in the Graphical Process Modeler (GPM) and the text editor, some meta data is lost. What meta data will be retained regardless of the switch?

正確答案: A
問題3
While gracefully stopping the system in a controlled manner, IBM Sterling B2B Integrator (SBI) has the ability to control the completion of which type of queued items on the local node?

正確答案: C
問題4
How can a report be set to be stored on the file system?

正確答案: D
問題5
A global persistence level is set to PERSISTENCE_NONE. Which Business Process (BP) persistencesettings will result in more information being persisted?

正確答案: D
問題6
Which option shuts down a systemand ensures that currently running processes complete prior to termination?

正確答案: B
問題7
Given the following BPML, what will the value of "c" be in ProcessData when the Business Process (BP) completes successfully?

正確答案: D
問題8
Based on the screen shot,

how many days will documents and other trackable data stay in the system by default?

正確答案: C
問題9
The Clean-Up processes monitor available in the troubleshooter screen identifies all the system clean up processes along with status, work flow ID and last time each process was run. What are three of the required system processes that need to be run on a regular schedule? (Choose three.)

正確答案: D,E,F
問題10
A company would like to maintain communication adapter availability in the event of IBM Sterling B2B Integrator (SBI) being shut down for maintenance. What can be deployed to maintain adapter communications?

正確答案: C