IBM C2060-218 考試概覽:
| 認證廠商: | IBM |
|---|---|
| 考試名稱: | IBM Sterling B2B Integrator V5.2 解決方案實作 |
| 考試代碼: | C8060-218 |
| 考試形式: | 複選題, 單選題 |
| 支援語言: | 英文 |
| 相關認證: | IBM Certified Solution Implementer - Sterling B2B Integrator V5.2 |
| 考試費用: | 200 美元 |
| 實際考試題數: | 104 |
| 範例考題: | IBM C2060-218 範例考題 |
| 考試方式: | 可於 IBM 授權考試中心或 Pearson VUE 考試中心應考,或於提供線上監考服務之地區採線上方式應考。 |
| 必備條件: | 無強制應考資格考試。建議具備 IBM Sterling B2B Integrator V5.2 實作、業務流程、配接器、交易夥伴設定與安全通訊相關實務經驗。 |
| 官方大綱網址: | https://www.ibm.com/training/certification/ |
IBM C2060-218 考試大綱主題:
| 章節 | 目標 |
|---|---|
| 交易夥伴與通訊設定 | - 交易夥伴設定
|
| 系統管理與效能調校 | - 系統管理
|
| 文件與資料處理 | - 文件管理
|
| 安全性 | - 安全通訊
|
| 服務與配接器設定 | - Sterling 服務
|
| 業務流程開發 | - 業務流程建模
|
最新的 IBM Certified Solution Implementer C2060-218 免費考試真題:
A company has a new version of an activeBusiness Process (BP). They would like to add the new .bp version from the Graphical Process Modeler (GPM) to IBM Sterling B2B
Integrator (SBI) and have the new version run. Which steps need to be completed to use the new version?
- A. Create a new Process Definition.
Provide a new or varied name.
Configure schedules and invokes to use new name. - B. Check out existing version in Source Manger.
Check-in new version.
Set new version to default during check-in. - C. Delete previous version.
Check-in new version.
Set new versionto default in Execution Manager. - D. Disable previous version.
Check-in new version.
Set new version to default in Execution Manager.
答案:B 🗳️
For increased availability reasons, a two-node application cluster has been multi-homed with each node having two network adapters cards. The system needs to be enabled to accept inbound FTP or FTP SSL client connection on port 25000. The system will use a wildcard (*) default in the perimeter server. How many FTP server adapters need to be configured to support ACTIVE and PASSIVE user initiated seasons?
- A. 4
- B. 8
- C. 16
- D. 2
答案:D 🗳️
A developer needs to check if the 'Preprocess' element equals 'Y' in Process Data. Which statement is most efficient?
- A. //ProcessData/INPUT/Header/Preprocess/text() = 'Y'
- B. string(INPUT/Header/Preprocess) = 'Y'
- C. string(//INPUT/Header/Preprocess) = 'Y'
- D. INPUT/Header/Preprocess = 'Y'
答案:B 🗳️
The system default for the amount of time a Business Process (BP) remains online in the system is set to five days. How can thatvalue be overridden?
- A. Create a new Retention Service configuration.
- B. Modify the lifespan setting for a BP.
- C. Update noapp.properties.
- D. Update with the Performance Tuning wizard.
答案:B 🗳️
A developer has set up a File System Adapter tomonitor a specific folder on the file system.
When a file arrives in the folder, a Business Process (BP) will be executed. Where will the
file payload be available to the rest of the BP?
- A. Process Document
- B. Process Data
- C. Primary Document
- D. Primary Data
答案:C 🗳️
正在檢視第 1 頁(共 21 頁)。
正在檢視第 1-5 題(共 104 題)。

下載最新試用版
我們對我們的產品非常有信心,所以我們不提供会给客户带去麻煩的產品。


0位客戶反饋


