IBM C4070-604 考試概覽:
| 認證廠商: | IBM |
|---|---|
| 考試名稱: | IBM System z 技術 V5 |
| 考試代碼: | C4070-604 |
| 及格分數: | 77% |
| 相關認證: | IBM Certified System z Technical Specialist |
| 考試費用: | 約 200 美元(因地區而異) |
| 證照有效期限: | 3 年 |
| 實際考試題數: | 57 |
| 考試形式: | 選擇題, 情境題 |
| 考試時間: | 75 分鐘 |
| 支援語言: | Japanese, English |
| 推薦課程: | IBM 官方訓練課程 |
| 考試報名: | Pearson VUE 考試預約 IBM 認證註冊 |
| 範例考題: | IBM C4070-604 範例考題 |
| 考試方式: | 可於 Pearson VUE 考試中心應考,或選擇線上監考 |
| 必備條件: | 建議具備 3-5 年 IBM System z 環境相關經驗;無強制性先修考試 |
| 官方大綱網址: | https://www.ibm.com/certify |
IBM C4070-604 考試大綱主題:
| 章節 | 權重 | 目標 |
|---|---|---|
| 安裝與安裝後支援 | 25-30% | - 初始設定與效能調校 - 疑難排解與問題確認 - 效能監控與最佳化 - 維護與支援流程 - 安裝程序與驗證 |
| 評估與建立客戶環境及規劃 | 30-35% | - 解決方案設計與整合分析 - 業務與技術需求評估 - System z 架構與 zEnterprise 概覽 - 容量規劃與規模評估工具 |
| 安裝規劃與遷移考量 | 35-40% | - 硬體設定與組件 - I/O、網路與儲存規劃 - 安全與法規遵循規劃 - Parallel Sysplex 與耦合設施設計 - 遷移策略與工具 |
最新的 IBM Certified Specialist C4070-604 免費考試真題:
A System z customer is planning to move their data center with several existing System z servers to a new space without a raised floor. Which of the following requirements should the technical specialist discuss with the customer?
- A. Confirm all the System z servers are z9 BC, z10 BC or z114
- B. Top Exit Cabling Option is required for all the CPCs
- C. Ordering the height reduction feature if needed
- D. Confirm the new installation is compliant with the Installation Manual for Physical Plugging
答案:A 🗳️
Which of the following is a key benefit to customers who deploy zEnterprise compared to other solutions?
- A. A hypervisor infrastructure that allows movement of an application online between different architectures
- B. A management solution that provides support across multiple x86 hypervisors.
- C. A hypervisor and hardware management across multiple platforms.
- D. A management solution for the complete mulit-vendor infrastructure within a datacenter.
答案:C 🗳️
A System z technical specialist is configuring an MES upgrade of a z10EC to a z196. The MRREPORT does not properly reflect the latest z10 configuration since a few cards were swapped recently. This needs to be corrected for a TDA in two weeks. Which of the following actions address this situation?
- A. Transmit the VPD to the IBM manufacturing plant
- B. Run eConfig
- C. Manually edit the MRREPORT to account for the changes
- D. Ignore the removed cards and proceed with the configuration
答案:A 🗳️
正在檢視第 1 頁(共 12 頁)。
正在檢視第 1-5 題(共 57 題)。

下載最新試用版
1324位客戶反饋
我們對我們的產品非常有信心,所以我們不提供会给客户带去麻煩的產品。








223.140.59.* -
太驚喜了,你們的考試練習題和答案真的很好,我就這樣輕松的通過了 C4070-604 考試,而且價格也非常合理!