最新的Nutanix Certified Master - Multicloud Infrastructure (NCM-MCI) - NCM-MCI-6.10免費考試真題

問題1
Task 9
The application team has requested several mission-critical VMs to be configured for disaster recovery. The remote site (when added) will not be managed by Prism Central. As such, this solution should be built using the Web Console.
Disaster Recovery requirements per VM:
Mkt01
RPO: 2 hours
Retention: 5 snapshots
Fin01
RPO: 15 minutes
Retention: 7 days
Dev01
RPO: 1 day
Retention: 2 snapshots
Configure a DR solution that meets the stated requirements.
Any objects created in this item must start with the name of the VM being protected.
Note: the remote site will be added later
正確答案:
See the Explanation for step by step solution.
Explanation:
To configure a DR solution that meets the stated requirements, you can follow these steps:
Log in to the Web Console of the source cluster where the VMs are running.
Click on Protection Domains on the left menu and click on Create Protection Domain.
Enter a name for the protection domain, such as PD_Mkt01, and a description if required. Click Next.
Select Mkt01 from the list of VMs and click Next.
Select Schedule Based from the drop-down menu and enter 2 hours as the interval. Click Next.
Select Remote Site from the drop-down menu and choose the remote site where you want to replicate the VM.
Click Next.
Enter 5 as the number of snapshots to retain on both local and remote sites. Click Next.
Review the protection domain details and click Finish.
Repeat the same steps for Fin01 and Dev01, using PD_Fin01 and PD_Dev01 as the protection domain names, and adjusting the interval and retention values according to the requirements.


問題2
Task 1
An administrator needs to configure storage for a Citrix-based Virtual Desktop infrastructure.
Two VDI pools will be created
Non-persistent pool names MCS_Pool for tasks users using MCS Microsoft Windows 10 virtual Delivery Agents (VDAs) Persistent pool named Persist_Pool with full-clone Microsoft Windows 10 VDAs for power users
20 GiB capacity must be guaranteed at the storage container level for all power user VDAs The power user container should not be able to use more than 100 GiB Storage capacity should be optimized for each desktop pool.
Configure the storage to meet these requirements. Any new object created should include the name of the pool (s) (MCS and/or Persist) that will use the object.
Do not include the pool name if the object will not be used by that pool.
Any additional licenses required by the solution will be added later.
正確答案:
See the Explanation for step by step solution.
Explanation:
To configure the storage for the Citrix-based VDI, you can follow these steps:
Log in to Prism Central using the credentials provided.
Go to Storage > Storage Pools and click on Create Storage Pool.
Enter a name for the new storage pool, such as VDI_Storage_Pool, and select the disks to include in the pool.
You can choose any combination of SSDs and HDDs, but for optimal performance, you may prefer to use more SSDs than HDDs.
Click Save to create the storage pool.
Go to Storage > Containers and click on Create Container.
Enter a name for the new container for the non-persistent pool, such as MCS_Pool_Container, and select the storage pool that you just created, VDI_Storage_Pool, as the source.
Under Advanced Settings, enable Deduplication and Compression to reduce the storage footprint of the non- persistent desktops. You can also enable Erasure Coding if you have enough nodes in your cluster and want to save more space. These settings will help you optimize the storage capacity for the non-persistent pool.
Click Save to create the container.
Go to Storage > Containers and click on Create Container again.
Enter a name for the new container for the persistent pool, such as Persist_Pool_Container, and select the same storage pool, VDI_Storage_Pool, as the source.
Under Advanced Settings, enable Capacity Reservation and enter 20 GiB as the reserved capacity. This will guarantee that 20 GiB of space is always available for the persistent desktops. You can also enter 100 GiB as the advertised capacity to limit the maximum space that this container can use. These settings will help you control the storage allocation for the persistent pool.
Click Save to create the container.
Go to Storage > Datastores and click on Create Datastore.
Enter a name for the new datastore for the non-persistent pool, such as MCS_Pool_Datastore, and select NFS as the datastore type. Select the container that you just created, MCS_Pool_Container, as the source.
Click Save to create the datastore.
Go to Storage > Datastores and click on Create Datastore again.
Enter a name for the new datastore for the persistent pool, such as Persist_Pool_Datastore, and select NFS as the datastore type. Select the container that you just created, Persist_Pool_Container, as the source.
Click Save to create the datastore.
The datastores will be automatically mounted on all nodes in the cluster. You can verify this by going to Storage > Datastores and clicking on each datastore. You should see all nodes listed under Hosts.
You can now use Citrix Studio to create your VDI pools using MCS or full clones on these datastores. For more information on how to use Citrix Studio with Nutanix Acropolis, see Citrix Virtual Apps and Desktops on Nutanix or Nutanix virtualization environments.


https://portal.nutanix.com/page/documents/solutions/details?targetId=BP-2079-Citrix-Virtual-Apps-and- Desktops:bp-nutanix-storage-configuration.html
問題3
Use Prism Element for this question.
The Application team has a 3 tier application (App Server, Web Server, and Database Server) that is mission critical and requires as close to 0 RPO and RTO as possible with their current license level.
The organization has 2 clusters, with one cluster (Cluster 1) being production and the other cluster (Cluster 2) being remote/DR. Cluster 2 should be able to fail back to Cluster 1.
The connectivity between the two sites is >5ms and replication traffic should not use more than 10Mbps of bandwidth. The Application team requests a plan that includes the ability to go back 2 days locally, and 2 days remotely.
The team also requests that all 3 VMs be treated as a single group and backed up collectively in a snapshot.
The three VMs are:
* Web-Prod
* App-Prod
* DB-Prod
Use Task3 as part of the name for any objects created for this task.
Note: VMs do NOT need to be powered on. You will need to use the 172.30.0.x IP addresses when configuring DR.
正確答案:
See the Explanation below for detailed answer.
Explanation:
Here is the step-by-step solution to configure Disaster Recovery from the Cluster 1 Prism Element interface.
1. Add Cluster 2 as a Remote Site
First, you must register Cluster 2 as a DR target for Cluster 1.
* From the Cluster 1 Prism Element dashboard, navigate to Data Protection from the main dropdown menu.
* Click the Remote Site tab.
* Click the + Remote Site button and select Physical Cluster.
* In the "Name" field, enter Cluster2_DR_Task3.
* In the "Address" field, enter the 172.30.0.x Virtual IP address of Cluster 2.
* Click Save. The clusters will exchange credentials and connect.
2. Throttle Replication Bandwidth
Next, apply the 10 Mbps bandwidth limit for traffic going to Cluster 2.
* On the same Remote Site tab, select the newly created Cluster2_DR_Task3.
* Click the Update button.
* In the dialog, set the Bandwidth Limit to 10 Mbps.
* Click Save.
3. Create the Protection Domain
A Protection Domain (PD) is the top-level object that will manage the VMs and replication schedules.
* In the Data Protection dashboard, click the Table tab.
* Click the + Protection Domain button and select Async DR.
* For the Name, enter App_PD_Task3.
* Click Create.
4. Protect VMs in a Consistency Group
Now you will add the three application VMs to the new Protection Domain as a single Consistency Group (CG).
* You will be taken to the dashboard for the new App_PD_Task3. In the Entities panel, click the Protect Entities button.
* In the "Protect Entities" dialog, search for and select the three VMs:
* Web-Prod
* App-Prod
* DB-Prod
* Click Next.
* Select Create new consistency group and name it App_CG_Task3.
* Click Protect.
5. Create the Replication Schedule
Finally, configure the schedule to meet the RPO and retention requirements.
* In the App_PD_Task3 dashboard, click the Schedules tab.
* Click the + New Schedule button.
* Remote Site: Select Cluster2_DR_Task3.
* RPO (Repeat every): Select NearSync. Set the RPO to 1 minute.
* Note: This is the lowest possible RPO for an Async (>5ms latency) connection, fulfilling the "as close to 0" requirement.
* Local Retention: Set to 2 Days.
* Remote Retention: Set to 2 Days.
* Ensure the "Store snapshots for 2-way replication" checkbox is enabled to allow failback from Cluster 2.
* Click Create Schedule.
問題4
The DB team is requesting an SQL database instance and has requested it be configured for best performance.
This VM has been migrated from a 3 tier solution into Nutanix.
The database VM hosts 4 databases, each set to a 20 GB limit. Logs are expected to not grow beyond 20 GB and should be limited to within 25% to avoid runaway processes. Do not configure more storage than is needed.
The VM that has been migrated is identified as sql3532. Once the VM has been properly reconfigured, the DBA team will reconfigure the OS and database.
The VM should be configured as per KB-3532.
While this VM is being tested, make sure it is the first VM to power up in the event the node it is on goes down.
To maximize performance, ensure as much of the VM as possible will be kept on SSD drives.
Note: The VM does not need to be powered on. The VM should remain on the default container and should not be configured with a volume group. No network is required at this time.
正確答案:
See the Explanation below for detailed answer.
Explanation:
Here is the step-by-step solution to reconfigure the sql3532 virtual machine.
This task is performed from the Prism Element interface for the cluster the VM is on (e.g., Cluster 1).
1. Locate and Update the VM
* From the Prism Element main dashboard, navigate to the VM view.
* Find the VM named sql3532 in the VM table.
* Select the checkbox next to sql3532 and click the Update button.
2. Configure HA Priority and Flash Mode
In the "Update VM" dialog, configure the HA and SSD performance settings:
* HA Priority:
* Find the VM High Availability section.
* Select the High Priority radio button. This ensures it is one of the first VMs to power on during an HA event.
* Flash Mode (SSD Performance):
* Scroll down to the Flash Mode section.
* Check the box to Enable Flash Mode. This pins the VM's vDisks to the SSD tier, satisfying the requirement to keep as much of the VM as possible on SSDs, especially since it's on the default (hybrid) container.
3. Reconfigure Disks (per KB-3532)
While still in the "Update VM" dialog, scroll to the Disks section to add the new data and log disks. The key to "best performance" (KB-3532) is to place Data and Logs on separate vSCSI controllers.
* (The VM already has an OS disk, which we will assume is on scsi.0.)
* Add Data Disk:
* Click the + Add New Disk button.
* Storage Container: default (as required).
* Size: 80 GB (for the 4 x 20 GB databases).
* Bus Type: SCSI.
* Device Index: 1. (This creates a new vSCSI controller, scsi.1, for the data disk).
* Click Add.
* Add Log Disk:
* Click the + Add New Disk button.
* Storage Container: default (as required).
* Size: 20 GB.
* Bus Type: SCSI.
* Device Index: 2. (This creates a third vSCSI controller, scsi.2, for the log disk).
* Click Add.
4. Save Configuration
* After adding the disks and setting HA/Flash Mode, click the main Save button at the bottom of the
"Update VM" dialog.
The VM is now configured with high availability, its storage is pinned to SSD, and its disk layout follows performance best practices by separating the OS, Data, and Log I/O paths onto three different controllers.